I mean if this is really from a few days ago, they haven't even put in all the seats yet. The roof is still being installed. It's gonna be a race. Jorge Mas said it's on schedule but they are definitely down to the wire.


stuff like this makes me think its ok that the opening of etihad is pushed till late summer 2027. this way they not rushing (hopefully no other setbacks arise)
 
Last edited:
stuff like this makes me ok that the opening of etihad is pushed till late summer 2027. this way they not rushing (hopefully no other setbacks arise)

It really does make sense to open it for the start of the new calendar and not for the sprint season. As excited as we all are to finally get inside, they will use those extra four months to really make it perfect.
 
I mean if this is really from a few days ago, they haven't even put in all the seats yet. The roof is still being installed. It's gonna be a race. Jorge Mas said it's on schedule but they are definitely down to the wire.

They are on the Italy hockey arena timeline I see - all done in the last two weeks.

(The hockey arena actually was done - went to several games there during the Olympics).
 